messages from 2011-08-16 06:57:54 to 2011-08-25 18:51:35 UTC [more...]
[PATCH] tty/powerpc: fix build break with ehv_bytechan.c on allyesconfig
2011-08-25 18:51 UTC (5+ messages)
linux-next: manual merge of the xen tree with the tip tree
2011-08-25 18:26 UTC (3+ messages)
linux-next: build failure after merge of the final tree (akpm and moduleh trees related)
2011-08-25 18:10 UTC (2+ messages)
[PATCH] [v2] tty/powerpc: fix build break with ehv_bytechan.c on allyesconfig
2011-08-25 18:06 UTC
linux-next: Tree for Aug 4
2011-08-25 17:17 UTC (11+ messages)
` [PATCH -next] drivers/base/inode.c: let vmstat_text be optional
` [Patch] numa: introduce CONFIG_NUMA_SYSFS for drivers/base/node.c
` [patch] numa: fix NUMA compile error when sysfs and procfs are disabled
mmotm 2011-08-24-14-08 uploaded
2011-08-25 17:12 UTC (11+ messages)
linux-next: manual merge of the moduleh tree with the arm tree
2011-08-25 16:39 UTC (3+ messages)
linux-next: build failure after merge of the final tree (tty tree related)
2011-08-25 16:09 UTC (6+ messages)
[PATCH] [v4] tty/powerpc: introduce the ePAPR embedded hypervisor byte channel driver
2011-08-25 16:03 UTC (3+ messages)
linux-next: build failure after merge of the staging tree
2011-08-25 15:39 UTC (3+ messages)
linux-next: manual merge of the usb tree with the usb.current tree
2011-08-25 15:39 UTC (2+ messages)
linux-next: build failure after merge of the ptrace tree
2011-08-25 14:37 UTC (2+ messages)
linux-next: manual merge of the pm tree with the arm tree
2011-08-25 14:28 UTC (2+ messages)
linux-next: Tree for Aug 25
2011-08-25 6:35 UTC
linux-next: build failure after merge of the final tree (staging tree related)
2011-08-25 6:17 UTC
linux-next: manual merge of the moduleh tree with the lt-mtd tree
2011-08-25 5:23 UTC
linux-next: build warning after merge of the rcu tree
2011-08-25 5:04 UTC (4+ messages)
linux-next: Tree for Aug 24
2011-08-25 4:30 UTC (7+ messages)
` linux-next: Tree for Aug 24 (dynamic_debug)
linux-next: manual merge of the hid tree with the Linus' tree
2011-08-25 2:00 UTC
linux-next: build failure after merge of the final tree (staging tree related)
2011-08-24 23:28 UTC (5+ messages)
linux-next: build warning after merge of the mips tree
2011-08-24 23:18 UTC (3+ messages)
linux-next: build failure after merge of the final tree (ptrace tree related)
2011-08-24 15:16 UTC (3+ messages)
linux-next tree addition request (fbdev)
2011-08-24 14:33 UTC (2+ messages)
linux next: Native Linux KVM tool inclusion request
2011-08-24 9:38 UTC (11+ messages)
linux-next: Tree for Aug 23
2011-08-24 8:51 UTC (6+ messages)
` [PATCH -next] usb: fix dwc3 build when USB_GADGET_DWC3 is not enabled
` [PATCH -next v2] "
` [PATCH -next] usb: fix ipw.c build error, select USB_SERIAL_WWAN
linux-next: manual merge of the moduleh tree with the staging tree
2011-08-24 5:00 UTC
linux-next: manual merge of the staging tree with the fbdev tree
2011-08-24 4:48 UTC (2+ messages)
linux-next: build failure after merge of the tty tree
2011-08-24 4:50 UTC (2+ messages)
linux-next: Tree for Aug 22
2011-08-24 2:10 UTC (17+ messages)
` linux-next: Tree for Aug 22 (drivers/power/pda_power.c)
` [PATCH -next] staging: fix comedi build when COMEDI_PCI is not enabled
` [PATCH -next] power_supply: fix sysfs format warning
` linux-next: Tree for Aug 22 (evm)
linux-next: manual merge of the net tree with the unicore32 tree
2011-08-24 1:28 UTC (3+ messages)
linux-next: manual merge of the pm tree with the mfd tree
2011-08-24 1:12 UTC (4+ messages)
linux-next: build failure after merge of the final tree (wireless & staging trees related)
2011-08-24 1:06 UTC (9+ messages)
linux-next: manual merge of the net tree with the tree
2011-08-23 18:10 UTC (2+ messages)
linux-next: build failure after merge of the final tree
2011-08-23 14:32 UTC (2+ messages)
linux-next: build failure after merge of the moduleh tree
2011-08-23 9:59 UTC (2+ messages)
linux-next: boot test failure (net tree)
2011-08-23 8:29 UTC (19+ messages)
linux-next: manual merge of the security tree with the ocfs2 tree
2011-08-23 3:52 UTC
[PATCH linux-next] mfd: omap-usb-host: add module.h and export.h to fix build break
2011-08-22 15:06 UTC (3+ messages)
linux-next: manual merge of the pm tree with the s390 tree
2011-08-22 6:20 UTC (2+ messages)
linux kernel development
2011-08-22 4:53 UTC (2+ messages)
linux-next: build failure after merge of the final tree (pm tree related)
2011-08-20 7:50 UTC (6+ messages)
linux-next: build failure after merge of the pm tree
2011-08-19 21:31 UTC (2+ messages)
linux-next: Tree for July 29
2011-08-19 17:02 UTC (3+ messages)
` [PATCH -next] power: max8998_charger.c needs module.h
linux-next: manual merge of the wireless tree with the net tree
2011-08-19 1:03 UTC (2+ messages)
linux-next: Tree for Aug 19
2011-08-19 4:22 UTC
linux-next blackfin builds
2011-08-19 4:10 UTC (5+ messages)
linux-next: build warning after merge of the moduleh tree
2011-08-18 20:57 UTC (4+ messages)
[PATCH] evm: add Kconfig TCG_TPM dependency
2011-08-18 17:38 UTC (3+ messages)
linux-next: Tree for Aug 18 (GNU patch and "git diffs: Support symlinks")
2011-08-18 9:35 UTC
linux-next: error while fetching the unicore32 tree
2011-08-18 9:23 UTC (3+ messages)
linux-next: Tree for Aug 18
2011-08-18 6:00 UTC
linux-next: manual merge of the tip tree with the tree
2011-08-18 4:14 UTC
[PATCH] evm: add MAINTAINERS entry
2011-08-18 2:59 UTC (2+ messages)
linux-next: Tree for Aug 17
2011-08-17 17:00 UTC (3+ messages)
` linux-next: Tree for Aug 17 (EVM)
linux-next: build failure after merge of the final tree (sound-asoc tree related)
2011-08-17 4:21 UTC
linux-next: Tree for Aug 16
2011-08-16 12:38 UTC (2+ messages)
linux-next: build failure after merge of the final tree (net tree related)
2011-08-16 7:17 UTC (6+ messages)
linux-next: build warning after merge of the final tree
2011-08-16 7:08 UTC (4+ messages)
page: next (older) | prev (newer) | latest
This is a public inbox, see mirroring instructions
for how to clone and mirror all data and code used for this inbox;
as well as URLs for NNTP newsgroup(s).