From mboxrd@z Thu Jan 1 00:00:00 1970 Received: from yocto-www.yoctoproject.org (yocto-www.yoctoproject.org [140.211.169.56]) by mx.groups.io with SMTP id smtpd.web12.8091.1580831899259689064 for ; Tue, 04 Feb 2020 07:58:19 -0800 Authentication-Results: mx.groups.io; dkim=pass header.i=@gmail.com header.s=20161025 header.b=J4iKLhtb; spf=softfail (domain: gmail.com, ip: 140.211.169.56, mailfrom: sjolley.yp.pm@gmail.com) Received: by yocto-www.yoctoproject.org (Postfix, from userid 118) id A56C4E01404; Tue, 4 Feb 2020 07:58:18 -0800 (PST) X-Spam-Checker-Version: SpamAssassin 3.3.1 (2010-03-16) on yocto-www.yoctoproject.org X-Spam-Level: X-Spam-Status: No, score=-2.0 required=5.0 tests=BAYES_00,DKIM_SIGNED, DKIM_VALID,DKIM_VALID_AU,FREEMAIL_FROM,HTML_MESSAGE,RCVD_IN_DNSWL_NONE autolearn=ham version=3.3.1 X-Spam-HAM-Report: * -1.9 BAYES_00 BODY: Bayes spam probability is 0 to 1% * [score: 0.0000] * 0.0 FREEMAIL_FROM Sender email is commonly abused enduser mail provider * (sjolley.yp.pm[at]gmail.com) * -0.0 RCVD_IN_DNSWL_NONE RBL: Sender listed at https://www.dnswl.org/, no * trust * [209.85.210.182 listed in list.dnswl.org] * 0.0 HTML_MESSAGE BODY: HTML included in message * -0.1 DKIM_VALID_AU Message has a valid DKIM or DK signature from author's * domain * -0.1 DKIM_VALID Message has at least one valid DKIM or DK signature * 0.1 DKIM_SIGNED Message has a DKIM or DK signature, not necessarily * valid Received: from mail-pf1-f182.google.com (mail-pf1-f182.google.com [209.85.210.182]) by yocto-www.yoctoproject.org (Postfix) with ESMTP id 79C15E006EC for ; Tue, 4 Feb 2020 07:58:16 -0800 (PST) Received: by mail-pf1-f182.google.com with SMTP id k29so9650467pfp.13 for ; Tue, 04 Feb 2020 07:58:16 -0800 (PST) DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=20161025; h=from:to:subject:date:message-id:mime-version:content-language :thread-index; bh=Nm3LGhX7HTYPg3zPHVTCudJ0YJmaxjweFt8pvKaxNzk=; b=J4iKLhtbvK/5LVvHhgemGHK+theGgJIKJFZ3usM3qP/5/k6iH/l7BtYhcU5jTChyzk zKVFr9tnFN7R/lmat/lwRnqrhbevPuV61fKEKK3jywUyUwTV8r+K3qc6lJ8doryBakLA JX4nZN+8J5kmmRECtgaNxw7GKU6R2yw2J9zQ6uN6zzB1z38ml7LHSWfbVoNzGWtz7VI3 A3GvLAIIO6phBwCLD/VMIht0MlsTsFKvy8ZP2JHXi8HYVjp2OZGkp+WH44skJAa4CNrN 04AkGUumWguPIy+iQMnnPlTogFZxP00RkIJ2P5HAnhytS7++fHvEGGip7uU9WLNB+iPw Z2qg== X-Google-DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=1e100.net; s=20161025; h=x-gm-message-state:from:to:subject:date:message-id:mime-version :content-language:thread-index; bh=Nm3LGhX7HTYPg3zPHVTCudJ0YJmaxjweFt8pvKaxNzk=; b=glOyFqwiy081NvLIFZKSHF230VmFevT9ATd4N39kOOws4zyF6qvEpvifzBqzDINMh2 OLwzDLGvtziurXJBbgXiqvHMllI0Izkf52vUNrvXm2N8NoRIgS1yhPSp7slgsVTm8WFn WjD0ovdxazAG22R18fFzU1EyZbz/eC6sdEBDrCoWwJfcT3D9pfvyw/w+xMiS9jkTe+23 ImYG3Mq4ux5mrO+fk6TCSLq9OA8d9PewaYkei61HoE4LF9pq7GG9gSAP093e8IZ+8DyY dH/prcarYSDaNKv+wUKPAJBgS3Q74d4w/ToH6+PcbY9wFYxOS6UC/KUslMCspZy6dAUH 7iJg== X-Gm-Message-State: APjAAAWL41Ms/A8TakugRf326GtXTt+5mnsQmh/q2fwLoXIxEljuXHbJ jJZjNNFmZ3Hf2tU43Y40OoU= X-Google-Smtp-Source: APXvYqx+F4rh2UI1BYqrhaP83Tq3bj3NDx8mPbz9xCYGNL+3B65/vN2gdEhMK57d3JBHrUH2Uct5zw== X-Received: by 2002:a63:8dc4:: with SMTP id z187mr16248482pgd.68.1580831895928; Tue, 04 Feb 2020 07:58:15 -0800 (PST) Received: from skjolley (c-71-59-136-149.hsd1.or.comcast.net. [71.59.136.149]) by smtp.gmail.com with ESMTPSA id a16sm24021166pgb.5.2020.02.04.07.58.15 (version=TLS1_2 cipher=ECDHE-RSA-AES128-GCM-SHA256 bits=128/128); Tue, 04 Feb 2020 07:58:15 -0800 (PST) From: "Stephen Jolley" To: , Subject: Yocto Project Status WW05'20 Date: Tue, 4 Feb 2020 07:58:15 -0800 Message-ID: <095001d5db73$e911af70$bb350e50$@gmail.com> MIME-Version: 1.0 X-Mailer: Microsoft Outlook 16.0 Thread-Index: AdXbc7xamVizIVteTh+3l6EuS6VXMw== Content-Type: multipart/alternative; boundary="----=_NextPart_000_0951_01D5DB30.DAF1A3C0" Content-Language: en-us ------=_NextPart_000_0951_01D5DB30.DAF1A3C0 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: 7bit Current Dev Position: YP 3.1 M3 Next Deadline: YP 3.1 M3 build date 2/24/2020 Next Team Meetings: * Bug Triage meeting Thursday Feb. 6th at 7:30am PDT ( https://zoom.us/j/454367603) * Monthly Project Meeting Tuesday Feb. 4th at 8am PDT ( https://zoom.us/j/990892712) * Weekly Engineering Sync Tuesday Feb. 11th at 8am PDT ( https://zoom.us/j/990892712) * Twitch - Next event is Tuesday Feb. 11th at 8am PDT ( https://www.twitch.tv/yocto_project) Key Status/Updates: * YP 3.1 M2 is due to be released with reservations. * There are significant concerns with M2 due to the build reproducibility failures which continue to cause major problems with master too. These will have to block the M3 build/release. * The NPM fetcher rework patches have now merged, we'd like to thank Jean-Marie Lemetayer for his patience whilst they were made into good shape with regression tests, thanks, its a good end result. * The host dependencies on makeinfo and pod2man have now been dropped to simplify build dependencies and improve reproducibility. * The mpc8315e-rdb machine/BSP has been dropped from meta-yocto-bsp. * Build reproducibility issues have been tracked down to a number of causes but many more remain, some with open bugs, some with bugs yet to be filed. Any assistance with reproducibility issues is appreciated as is the major factor blocking patch merging at present. * Reproducibility failure debugging has been improved with better integration into the autobuilder to assist with this. Saved problematic output is now saved at: https://autobuilder.yocto.io/pub/repro-fail/ * Ongoing kernel issues still prevent kernel upgrades merging at present but work on debugging the issues is moving forward (thanks Victor/Cisco in particular) * We're collecting a list of companies, products and projects which use the Yocto Project on the wiki: https://wiki.yoctoproject.org/wiki/Project_Users Please add any you know are missing (or email Richard/Stephen who can add). * We have created a "documentation" list and a "licensing" list on the yocto project mailing list infrastructure. We believe these topics would benefit from dedicated discussions, the people involved usually aren't interested in bulk email as would be found on other lists. The new lists can be found at: https://lists.yoctoproject.org/g/licensing/join and https://lists.yoctoproject.org/g/docs/join * The triage team is worried about attendance at triage meetings and the project is finding it hard to find people to help fix bugs. If anyone is willing to work on bugs, assistance would be greatly appreciated. YP 3.1 Milestone Dates: * YP 3.1 M2 should release shortly * YP 3.1 M3 build date 2/24/2020 * YP 3.1 M3 release date 3/6/2020 * YP 3.1 M4 build date 3/30/2020 * YP 3.1 M4 release date 4/24/2020 Planned upcoming dot releases: * YP 2.7.3 build date 2/10/2020 * YP 2.7.3 release date 2/21/2020 * YP 3.0.2 build date 2/3/2020 * YP 3.0.2 release date 2/14/2020 Tracking Metrics: * WDD 2767 (last week 2765) ( https://wiki.yoctoproject.org/charts/combo.html) * Poky Patch Metrics * Total patches found: 1368 (last week 1368) * Patches in the Pending State: 544 (40%) [last week 545 (39%)] The Yocto Project's technical governance is through its Technical Steering Committee, more information is available at: https://wiki.yoctoproject.org/wiki/TSC The Status reports are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status [If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Program Manager * Cell: (208) 244-4460 * Email: sjolley.yp.pm@gmail.com ------=_NextPart_000_0951_01D5DB30.DAF1A3C0 Content-Type: text/html; boundary="----=_NextPart_000_0863_01D5D5B1.225AC780"; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

Current Dev = Position: YP 3.1 M3

Next Deadline: YP = 3.1 M3 build date 2/24/2020

 

Next Team = Meetings:

 

Key = Status/Updates:

  • YP 3.1 M2 is due to be released = with reservations.
  • There are significant concerns = with M2 due to the build reproducibility failures which continue to = cause major problems with master too. These will have to block the M3 = build/release.
  • The NPM fetcher rework patches = have now merged, we’d like to thank Jean-Marie Lemetayer for his = patience whilst they were made into good shape with regression tests, = thanks, its a good end result.
  • The host dependencies on = makeinfo and pod2man have now been dropped to simplify build = dependencies and improve reproducibility.
  • The mpc8315e-rdb machine/BSP = has been dropped from meta-yocto-bsp.
  • Build reproducibility issues = have been tracked down to a number of causes but many more remain, some = with open bugs, some with bugs yet to be filed. Any assistance with = reproducibility issues is appreciated as is the major factor blocking = patch merging at present.
  • Reproducibility failure = debugging has been improved with better integration into the autobuilder = to assist with this. Saved problematic output is now saved at: https://autobuilder.yocto.io/pub/repro-fail/
  • Ongoing kernel issues still = prevent kernel upgrades merging at present but work on debugging the = issues is moving forward (thanks Victor/Cisco in = particular)
  • We’re collecting a list = of companies, products and projects which use the Yocto Project on the = wiki: https://wiki.yoctoproject.org/wiki/Project_Users<= /span> Please add any you know are missing (or email Richard/Stephen = who can add).
  • We have created a = “documentation” list and a “licensing” list on = the yocto project mailing list infrastructure. We believe these topics = would benefit from dedicated discussions, the people involved usually = aren’t interested in bulk email as would be found on other lists. = The new lists can be found at: https://lists.yoctoproject.org/g/licensing/join and https://lists.yoctoproject.org/g/docs/join=  
  • The triage team is worried = about attendance at triage meetings and the project is finding it hard = to find people to help fix bugs. If anyone is willing to work on bugs, = assistance would be greatly appreciated.

 

YP 3.1 Milestone = Dates:

  • YP 3.1 M2 should release = shortly
  • YP 3.1 M3 build date = 2/24/2020
  • YP 3.1 M3 release date = 3/6/2020
  • YP 3.1 M4 build date  = 3/30/2020
  • YP 3.1 M4 release date  = 4/24/2020

 

Planned upcoming = dot releases:

  • YP 2.7.3 build date  = 2/10/2020
  • YP 2.7.3 release date = 2/21/2020
  • YP 3.0.2 build date  = 2/3/2020
  • YP 3.0.2 release date = 2/14/2020

 

Tracking = Metrics:

 

The Yocto = Project’s technical governance is through its Technical Steering = Committee, more information is available at:

https://wiki.yocto= project.org/wiki/TSC

 

The Status reports = are now stored on the wiki at: https://wiki.yocto= project.org/wiki/Weekly_Status

 

[If anyone has = suggestions for other information you’d like to see on this weekly = status update, let us know!]

 

Thanks,

 

Stephen K. Jolley<= o:p>

Yocto = Project Program Manager

(    Cell:         = ;       (208) = 244-4460

* Email:           = ;   sjolley.yp.pm@gmail.com

 

------=_NextPart_000_0951_01D5DB30.DAF1A3C0-- From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Received: from mail-pg1-f176.google.com (mail-pg1-f176.google.com [209.85.215.176]) by mail.openembedded.org (Postfix) with ESMTP id E4F87610BE for ; Tue, 4 Feb 2020 15:58:14 +0000 (UTC) Received: by mail-pg1-f176.google.com with SMTP id l3so5758553pgi.8 for ; Tue, 04 Feb 2020 07:58:16 -0800 (PST) DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=20161025; h=from:to:subject:date:message-id:mime-version:content-language :thread-index; bh=Nm3LGhX7HTYPg3zPHVTCudJ0YJmaxjweFt8pvKaxNzk=; b=J4iKLhtbvK/5LVvHhgemGHK+theGgJIKJFZ3usM3qP/5/k6iH/l7BtYhcU5jTChyzk zKVFr9tnFN7R/lmat/lwRnqrhbevPuV61fKEKK3jywUyUwTV8r+K3qc6lJ8doryBakLA JX4nZN+8J5kmmRECtgaNxw7GKU6R2yw2J9zQ6uN6zzB1z38ml7LHSWfbVoNzGWtz7VI3 A3GvLAIIO6phBwCLD/VMIht0MlsTsFKvy8ZP2JHXi8HYVjp2OZGkp+WH44skJAa4CNrN 04AkGUumWguPIy+iQMnnPlTogFZxP00RkIJ2P5HAnhytS7++fHvEGGip7uU9WLNB+iPw Z2qg== X-Google-DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=1e100.net; s=20161025; h=x-gm-message-state:from:to:subject:date:message-id:mime-version :content-language:thread-index; bh=Nm3LGhX7HTYPg3zPHVTCudJ0YJmaxjweFt8pvKaxNzk=; b=gjccjc1xb0aTIBiQGL0og/Ns1aOBV6gKe9nDg1PpyIgUuJwwZDUwGMhPeAROqNAYIr JlDYYgUmWQqzyuC2+LS4Ykb8evr8X9n3cWS52C6TYuT6mWwfs6nbBGcFJkfN//UX1EGN k274EHh/EPDUWBccohAwHIc5eUv9D3CgTlkt96hpZ20xTBKypYXWn8sKe9S+6FIeuo8+ LOftPhH7wqfBQ0MCYQ7+0efoh/iQDvjN7l9/NukADJ8KRPaq6b0Dp+OJor8fadm7Joa9 PvOBGggjB9c632S20FuRAP2waIxBawOHikViGG56jNn5p9guTzvUGnPOzSlYK1WX/l1V Cggw== X-Gm-Message-State: APjAAAVfSqTVG7ZwgidG+NPCHEk1332Hse1dmpronSP/2lDXHBfxJK/M I+Ozhb705L+q57ANwPykQ1w= X-Google-Smtp-Source: APXvYqx+F4rh2UI1BYqrhaP83Tq3bj3NDx8mPbz9xCYGNL+3B65/vN2gdEhMK57d3JBHrUH2Uct5zw== X-Received: by 2002:a63:8dc4:: with SMTP id z187mr16248482pgd.68.1580831895928; Tue, 04 Feb 2020 07:58:15 -0800 (PST) Received: from skjolley (c-71-59-136-149.hsd1.or.comcast.net. [71.59.136.149]) by smtp.gmail.com with ESMTPSA id a16sm24021166pgb.5.2020.02.04.07.58.15 (version=TLS1_2 cipher=ECDHE-RSA-AES128-GCM-SHA256 bits=128/128); Tue, 04 Feb 2020 07:58:15 -0800 (PST) From: To: , Date: Tue, 4 Feb 2020 07:58:15 -0800 Message-ID: <095001d5db73$e911af70$bb350e50$@gmail.com> MIME-Version: 1.0 X-Mailer: Microsoft Outlook 16.0 Thread-Index: AdXbc7xamVizIVteTh+3l6EuS6VXMw== Subject: Yocto Project Status WW05'20 X-BeenThere: openembedded-core@lists.openembedded.org X-Mailman-Version: 2.1.12 Precedence: list List-Id: Patches and discussions about the oe-core layer List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Tue, 04 Feb 2020 15:58:15 -0000 Content-Type: multipart/alternative; boundary="----=_NextPart_000_0951_01D5DB30.DAF1A3C0" Content-Language: en-us ------=_NextPart_000_0951_01D5DB30.DAF1A3C0 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: 7bit Current Dev Position: YP 3.1 M3 Next Deadline: YP 3.1 M3 build date 2/24/2020 Next Team Meetings: * Bug Triage meeting Thursday Feb. 6th at 7:30am PDT ( https://zoom.us/j/454367603) * Monthly Project Meeting Tuesday Feb. 4th at 8am PDT ( https://zoom.us/j/990892712) * Weekly Engineering Sync Tuesday Feb. 11th at 8am PDT ( https://zoom.us/j/990892712) * Twitch - Next event is Tuesday Feb. 11th at 8am PDT ( https://www.twitch.tv/yocto_project) Key Status/Updates: * YP 3.1 M2 is due to be released with reservations. * There are significant concerns with M2 due to the build reproducibility failures which continue to cause major problems with master too. These will have to block the M3 build/release. * The NPM fetcher rework patches have now merged, we'd like to thank Jean-Marie Lemetayer for his patience whilst they were made into good shape with regression tests, thanks, its a good end result. * The host dependencies on makeinfo and pod2man have now been dropped to simplify build dependencies and improve reproducibility. * The mpc8315e-rdb machine/BSP has been dropped from meta-yocto-bsp. * Build reproducibility issues have been tracked down to a number of causes but many more remain, some with open bugs, some with bugs yet to be filed. Any assistance with reproducibility issues is appreciated as is the major factor blocking patch merging at present. * Reproducibility failure debugging has been improved with better integration into the autobuilder to assist with this. Saved problematic output is now saved at: https://autobuilder.yocto.io/pub/repro-fail/ * Ongoing kernel issues still prevent kernel upgrades merging at present but work on debugging the issues is moving forward (thanks Victor/Cisco in particular) * We're collecting a list of companies, products and projects which use the Yocto Project on the wiki: https://wiki.yoctoproject.org/wiki/Project_Users Please add any you know are missing (or email Richard/Stephen who can add). * We have created a "documentation" list and a "licensing" list on the yocto project mailing list infrastructure. We believe these topics would benefit from dedicated discussions, the people involved usually aren't interested in bulk email as would be found on other lists. The new lists can be found at: https://lists.yoctoproject.org/g/licensing/join and https://lists.yoctoproject.org/g/docs/join * The triage team is worried about attendance at triage meetings and the project is finding it hard to find people to help fix bugs. If anyone is willing to work on bugs, assistance would be greatly appreciated. YP 3.1 Milestone Dates: * YP 3.1 M2 should release shortly * YP 3.1 M3 build date 2/24/2020 * YP 3.1 M3 release date 3/6/2020 * YP 3.1 M4 build date 3/30/2020 * YP 3.1 M4 release date 4/24/2020 Planned upcoming dot releases: * YP 2.7.3 build date 2/10/2020 * YP 2.7.3 release date 2/21/2020 * YP 3.0.2 build date 2/3/2020 * YP 3.0.2 release date 2/14/2020 Tracking Metrics: * WDD 2767 (last week 2765) ( https://wiki.yoctoproject.org/charts/combo.html) * Poky Patch Metrics * Total patches found: 1368 (last week 1368) * Patches in the Pending State: 544 (40%) [last week 545 (39%)] The Yocto Project's technical governance is through its Technical Steering Committee, more information is available at: https://wiki.yoctoproject.org/wiki/TSC The Status reports are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status [If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Program Manager * Cell: (208) 244-4460 * Email: sjolley.yp.pm@gmail.com ------=_NextPart_000_0951_01D5DB30.DAF1A3C0 Content-Type: text/html; boundary="----=_NextPart_000_0863_01D5D5B1.225AC780"; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

Current Dev = Position: YP 3.1 M3

Next Deadline: YP = 3.1 M3 build date 2/24/2020

 

Next Team = Meetings:

 

Key = Status/Updates:

  • YP 3.1 M2 is due to be released = with reservations.
  • There are significant concerns = with M2 due to the build reproducibility failures which continue to = cause major problems with master too. These will have to block the M3 = build/release.
  • The NPM fetcher rework patches = have now merged, we’d like to thank Jean-Marie Lemetayer for his = patience whilst they were made into good shape with regression tests, = thanks, its a good end result.
  • The host dependencies on = makeinfo and pod2man have now been dropped to simplify build = dependencies and improve reproducibility.
  • The mpc8315e-rdb machine/BSP = has been dropped from meta-yocto-bsp.
  • Build reproducibility issues = have been tracked down to a number of causes but many more remain, some = with open bugs, some with bugs yet to be filed. Any assistance with = reproducibility issues is appreciated as is the major factor blocking = patch merging at present.
  • Reproducibility failure = debugging has been improved with better integration into the autobuilder = to assist with this. Saved problematic output is now saved at: https://autobuilder.yocto.io/pub/repro-fail/
  • Ongoing kernel issues still = prevent kernel upgrades merging at present but work on debugging the = issues is moving forward (thanks Victor/Cisco in = particular)
  • We’re collecting a list = of companies, products and projects which use the Yocto Project on the = wiki: https://wiki.yoctoproject.org/wiki/Project_Users<= /span> Please add any you know are missing (or email Richard/Stephen = who can add).
  • We have created a = “documentation” list and a “licensing” list on = the yocto project mailing list infrastructure. We believe these topics = would benefit from dedicated discussions, the people involved usually = aren’t interested in bulk email as would be found on other lists. = The new lists can be found at: https://lists.yoctoproject.org/g/licensing/join and https://lists.yoctoproject.org/g/docs/join=  
  • The triage team is worried = about attendance at triage meetings and the project is finding it hard = to find people to help fix bugs. If anyone is willing to work on bugs, = assistance would be greatly appreciated.

 

YP 3.1 Milestone = Dates:

  • YP 3.1 M2 should release = shortly
  • YP 3.1 M3 build date = 2/24/2020
  • YP 3.1 M3 release date = 3/6/2020
  • YP 3.1 M4 build date  = 3/30/2020
  • YP 3.1 M4 release date  = 4/24/2020

 

Planned upcoming = dot releases:

  • YP 2.7.3 build date  = 2/10/2020
  • YP 2.7.3 release date = 2/21/2020
  • YP 3.0.2 build date  = 2/3/2020
  • YP 3.0.2 release date = 2/14/2020

 

Tracking = Metrics:

 

The Yocto = Project’s technical governance is through its Technical Steering = Committee, more information is available at:

https://wiki.yocto= project.org/wiki/TSC

 

The Status reports = are now stored on the wiki at: https://wiki.yocto= project.org/wiki/Weekly_Status

 

[If anyone has = suggestions for other information you’d like to see on this weekly = status update, let us know!]

 

Thanks,

 

Stephen K. Jolley<= o:p>

Yocto = Project Program Manager

(    Cell:         = ;       (208) = 244-4460

* Email:           = ;   sjolley.yp.pm@gmail.com

 

------=_NextPart_000_0951_01D5DB30.DAF1A3C0--