From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Received: by yocto-www.yoctoproject.org (Postfix, from userid 118) id 506D0E00B63; Fri, 31 Jul 2015 08:14:44 -0700 (PDT) X-Spam-Checker-Version: SpamAssassin 3.3.1 (2010-03-16) on yocto-www.yoctoproject.org X-Spam-Level: X-Spam-Status: No, score=-6.9 required=5.0 tests=BAYES_00,HTML_MESSAGE, RCVD_IN_DNSWL_HI autolearn=ham version=3.3.1 X-Spam-HAM-Report: * -5.0 RCVD_IN_DNSWL_HI RBL: Sender listed at http://www.dnswl.org/, high * trust * [192.55.52.115 listed in list.dnswl.org] * -1.9 BAYES_00 BODY: Bayes spam probability is 0 to 1% * [score: 0.0000] * 0.0 HTML_MESSAGE BODY: HTML included in message Received: from mga14.intel.com (mga14.intel.com [192.55.52.115]) by yocto-www.yoctoproject.org (Postfix) with ESMTP id 2DE35E009E5 for ; Fri, 31 Jul 2015 08:14:37 -0700 (PDT) Received: from fmsmga003.fm.intel.com ([10.253.24.29]) by fmsmga103.fm.intel.com with ESMTP; 31 Jul 2015 08:14:31 -0700 X-ExtLoop1: 1 X-IronPort-AV: E=Sophos;i="5.15,585,1432623600"; d="scan'208,217";a="533742522" Received: from orsmsx107.amr.corp.intel.com ([10.22.240.5]) by FMSMGA003.fm.intel.com with ESMTP; 31 Jul 2015 08:14:31 -0700 Received: from orsmsx112.amr.corp.intel.com (10.22.240.13) by ORSMSX107.amr.corp.intel.com (10.22.240.5) with Microsoft SMTP Server (TLS) id 14.3.224.2; Fri, 31 Jul 2015 08:14:31 -0700 Received: from fmsmsx153.amr.corp.intel.com (10.18.125.6) by ORSMSX112.amr.corp.intel.com (10.22.240.13) with Microsoft SMTP Server (TLS) id 14.3.224.2; Fri, 31 Jul 2015 08:14:30 -0700 Received: from fmsmsx111.amr.corp.intel.com ([169.254.12.35]) by FMSMSX153.amr.corp.intel.com ([169.254.9.53]) with mapi id 14.03.0224.002; Fri, 31 Jul 2015 08:14:30 -0700 From: "Jolley, Stephen K" To: "yocto@yoctoproject.org" , "openembedded-core@lists.openembedded.org" Thread-Topic: Yocto Project Status WW31 Thread-Index: AdDLo5WJFc3IDJhPQtmE20iMf3rZ/Q== Date: Fri, 31 Jul 2015 15:14:30 +0000 Message-ID: <9ADD3FDE8B189B4AA2F8A3C711F8155E555E9384@fmsmsx111.amr.corp.intel.com> Accept-Language: en-US X-MS-Has-Attach: X-MS-TNEF-Correlator: x-originating-ip: [10.1.200.107] MIME-Version: 1.0 Subject: Yocto Project Status WW31 X-BeenThere: yocto@yoctoproject.org X-Mailman-Version: 2.1.13 Precedence: list List-Id: Discussion of all things Yocto Project List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Fri, 31 Jul 2015 15:14:44 -0000 Content-Language: en-US Content-Type: multipart/alternative; boundary="_000_9ADD3FDE8B189B4AA2F8A3C711F8155E555E9384fmsmsx111amrcor_" --_000_9ADD3FDE8B189B4AA2F8A3C711F8155E555E9384fmsmsx111amrcor_ Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: quoted-printable Current Dev Position: 1.9 Milestone 2 (M2) Next Deadline: M2 cut off of July 27th at noon GMT (on hold, see status) SWAT team rotation: Benjamin -> Juro https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team Key Status/Updates: * YP 1.9 M2 has been delayed whilst we investigated autobuilder runtime= failures, selftest failures, some potential license contamination issues. * The delay has also allowed us to prepare several important patch sets= including bitbake lock fixes, tinfoil2 and some toolchain improvements (in= cluding automated testing improvements). * Hoping for YP 1.9 M2 rc1 to build this weekend. * YP 1.8.1 and YP 1.7.3 point releases have been held until some of the= build issues are addressed. * Post YP 1.9 M2, there will be some more invasive changes including ch= anges to the default parameters to getVar and possibly getVarFLag as well a= s a switch to memory resident bitbake. * gcc5 is looking much improved, have fixes for u-boot but some linux-y= octo kernel issues remain. Key YP 1.9 Dates: 1.9 Feature Freeze Date/M3 Cut off: Aug. 24, 2015 noon GMT YP Final/M4 Cut off: Sept. 28, 2015 noon GMT 1.9 M2 Release Target: Before Aug. 14, 2015 1.9 M3 Release Target: Before Sept. 11 2015 1.9 final Release Target: Before Oct. 30, 2015 Key Status Links for YP: https://wiki.yoctoproject.org/wiki/Yocto_Project_v1.9_Status https://wiki.yoctoproject.org/wiki/Yocto_1.9_Schedule https://wiki.yoctoproject.org/wiki/Yocto_1.9_Features Tracking Metrics: WDD 1758 (last week 1791 ) (https://wiki.yoctoproject.org/charts/combo.html) [If anyone has suggestions for other information you'd like to see on this = weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Program Manager INTEL, MS JF1-255, 2111 N.E. 25th Avenue, Hillsboro, OR 97124 * Work Telephone: (503) 712-0534 * Cell: (208) 244-4460 * Email: stephen.k.jolley@intel.com --_000_9ADD3FDE8B189B4AA2F8A3C711F8155E555E9384fmsmsx111amrcor_ Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

Current Dev Position: 1.9 Milestone 2 (M2)

Next Deadline: M2 cut off of July 27th at noon= GMT (on hold, see status)

 

SWAT team rotation: Benjamin -> Juro=

https://wiki.yoctoproject.org/wiki/Yocto_= Build_Failure_Swat_Team

 

Key Status/Updates:

  • YP 1.9= M2 has been delayed whilst we investigated autobuilder runtime failures, s= elftest failures, some potential license contamination issues.  <= /o:p>
  • The de= lay has also allowed us to prepare several important patch sets including b= itbake lock fixes, tinfoil2 and some toolchain improvements (including auto= mated testing improvements).
  • Hoping= for YP 1.9 M2 rc1 to build this weekend.
  • YP 1.8= .1 and YP 1.7.3 point releases have been held until some of the build issue= s are addressed.
  • Post Y= P 1.9 M2, there will be some more invasive changes including changes to the= default parameters to getVar and possibly getVarFLag as well as a switch t= o memory resident bitbake.
  • gcc5 i= s looking much improved, have fixes for u-boot but some linux-yocto kernel = issues remain.

 

Key YP 1.9 Dates:<= /o:p>

1.9 Feature Freeze = Date/M3 Cut off: Aug. 24, 2015 noon GMT

YP Final/M4 Cut off= : Sept. 28, 2015 noon GMT

1.9 M2 Release Targ= et: Before Aug. 14, 2015

1.9 M3 Release Targ= et: Before Sept. 11 2015

1.9 final Release T= arget: Before Oct. 30, 2015

 

Key Status Links for YP:

https://wiki.yoctoproject.org/wiki/Yocto_Proj= ect_v1.9_Status

https://wiki.yoctoproject.org/wiki/Yocto_1.9_Schedul= e

https://wiki.yoctoproject.org/wiki/Yocto_1.9_Feature= s

 

Tracking Metrics:<= /o:p>

       &nbs= p;    WDD 1758 (last week 1791 )=

(https://wiki.yoct= oproject.org/charts/combo.html)

&nb= sp;    

[If anyone has suggestions for other informati= on you’d like to see on this weekly status update, let us know!]

 

Thanks,

 

Stephen K. Jolley<= span style=3D"font-size:16.0pt;font-family:"Tahoma","sans-se= rif";color:purple">

Yocto Project Program Manager

INTEL, MS JF1-255, 2111 N.E. 25th Avenue, Hillsboro, OR 97124

(<= /span>   Work Telephone:   =        (    Cell:      &= nbsp;           &nbs= p;            

* Email:&nb= sp;            =             &nb= sp;   stephen.k.jolley@intel.com<= span lang=3D"FR" style=3D"font-size:12.0pt;font-family:"Arial",&q= uot;sans-serif"">

 

--_000_9ADD3FDE8B189B4AA2F8A3C711F8155E555E9384fmsmsx111amrcor_--