From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Received: by yocto-www.yoctoproject.org (Postfix, from userid 118) id 910D2E00C5B; Mon, 21 May 2018 08:18:31 -0700 (PDT) X-Spam-Checker-Version: SpamAssassin 3.3.1 (2010-03-16) on yocto-www.yoctoproject.org X-Spam-Level: X-Spam-Status: No, score=-4.2 required=5.0 tests=BAYES_00,HTML_MESSAGE, RCVD_IN_DNSWL_MED autolearn=ham version=3.3.1 X-Spam-HAM-Report: * -2.3 RCVD_IN_DNSWL_MED RBL: Sender listed at http://www.dnswl.org/, * medium trust * [192.55.52.43 listed in list.dnswl.org] * -1.9 BAYES_00 BODY: Bayes spam probability is 0 to 1% * [score: 0.0000] * 0.0 HTML_MESSAGE BODY: HTML included in message Received: from mga05.intel.com (mga05.intel.com [192.55.52.43]) by yocto-www.yoctoproject.org (Postfix) with ESMTP id CFB15E00AE4 for ; Mon, 21 May 2018 08:18:29 -0700 (PDT) X-Amp-Result: SKIPPED(no attachment in message) X-Amp-File-Uploaded: False Received: from orsmga001.jf.intel.com ([10.7.209.18]) by fmsmga105.fm.intel.com with ESMTP/TLS/DHE-RSA-AES256-GCM-SHA384; 21 May 2018 08:18:28 -0700 X-ExtLoop1: 1 X-IronPort-AV: E=Sophos;i="5.49,426,1520924400"; d="scan'208,217";a="57723532" Received: from fmsmsx105.amr.corp.intel.com ([10.18.124.203]) by orsmga001.jf.intel.com with ESMTP; 21 May 2018 08:18:28 -0700 Received: from fmsmsx111.amr.corp.intel.com ([169.254.12.70]) by FMSMSX105.amr.corp.intel.com ([169.254.4.229]) with mapi id 14.03.0319.002; Mon, 21 May 2018 08:18:27 -0700 From: "Jolley, Stephen K" To: "yocto@yoctoproject.org" , "openembedded-core@lists.openembedded.org" Thread-Topic: =?Windows-1252?Q?Yocto_Project_Status_WW21=9218?= Thread-Index: AdPxFuJX5qMX1gNvTwKVqNMslhjsFw== Date: Mon, 21 May 2018 15:18:25 +0000 Message-ID: <9ADD3FDE8B189B4AA2F8A3C711F8155EC730CA94@fmsmsx111.amr.corp.intel.com> Accept-Language: en-US X-MS-Has-Attach: X-Auto-Response-Suppress: DR, OOF, AutoReply X-MS-TNEF-Correlator: x-originating-ip: [10.1.200.106] x-ctpclassification: CTP_NT x-titus-metadata-40: eyJDYXRlZ29yeUxhYmVscyI6IiIsIk1ldGFkYXRhIjp7Im5zIjoiaHR0cDpcL1wvd3d3LnRpdHVzLmNvbVwvbnNcL0ludGVsMyIsImlkIjoiYTQyZGU3NGQtNzllZS00YzJlLWE1YzctZTE4YzNjMWI0NjVhIiwicHJvcHMiOlt7Im4iOiJDVFBDbGFzc2lmaWNhdGlvbiIsInZhbHMiOlt7InZhbHVlIjoiQ1RQX05UIn1dfV19LCJTdWJqZWN0TGFiZWxzIjpbXSwiVE1DVmVyc2lvbiI6IjE3LjEwLjE4MDQuNDkiLCJUcnVzdGVkTGFiZWxIYXNoIjoiTHNTdTM3R1l5dFBCbFBCd1R2dlBGOG51MXlcL3dRTDNXTkR0MU40SjNzOU9PZ3gxRzc0b3dqc2s2cDA0RVB3UDAifQ== dlp-product: dlpe-windows dlp-version: 11.0.200.100 dlp-reaction: no-action MIME-Version: 1.0 Subject: =?UTF-8?B?WW9jdG8gUHJvamVjdCBTdGF0dXMgV1cyMeKAmTE4?= X-BeenThere: yocto@yoctoproject.org X-Mailman-Version: 2.1.13 Precedence: list List-Id: Discussion of all things Yocto Project List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Mon, 21 May 2018 15:18:31 -0000 Content-Language: en-US Content-Type: multipart/alternative; boundary="_000_9ADD3FDE8B189B4AA2F8A3C711F8155EC730CA94fmsmsx111amrcor_" --_000_9ADD3FDE8B189B4AA2F8A3C711F8155EC730CA94fmsmsx111amrcor_ Content-Type: text/plain; charset="Windows-1252" Content-Transfer-Encoding: quoted-printable Current Dev Position: YP 2.6 M1 is accepting patches. Next Deadline: YP 2.6 M1 release is June 11, 2018 SWAT Team Rotation: =B7 SWAT lead is currently: Ross =B7 SWAT team rotation: Ross -> Paul on May 25, 2018 =B7 SWAT team rotation: Paul -> Tracy on June 1, 2018 =B7 https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Tea= m Key Status/Updates: =B7 We thought 2.4.3 had built and gone into QA however it seems so= mething wasn=92t configured correctly and this didn=92t happen. We=92ll req= ueue it again today. =B7 There was a second 2.6 planning technical call on 15th where so= me further topics for 2.6 were discussed and some people/companies showed i= nterest in those areas. =B7 The next discussion on 2.6 planning will happen on June 5, 2018= at 8am PDT. =B7 There were blocking issues with the new buildbot/autobuilder co= debase which were preventing feature parity between the old and new codebas= es but after discussion with upstream we now have a plan on how to move for= ward. This unblocks progress on the new infrastructure. Planned Releases for YP 2.6: =B7 YP 2.6 M1 Build Target is June 11, 2018 =B7 YP 2.6 M1 Release Target is June 22, 2018 =B7 YP 2.6 M2 Build Target is July 16, 2018 =B7 YP 2.6 M2 Release Target is July 27, 2018 =B7 YP 2.6 M3 Build Target is Aug. 27, 2018 =B7 YP 2.6 M3 Release Target is Sept. 7, 2018 =B7 YP 2.6 M4 Build Target is Oct. 1, 2018 =B7 YP 2.6 M4 Release Target is Oct. 26, 2018 Planned upcoming dot releases: =B7 YP 2.3.4 (Pyro) will be built this week =B7 YP 2.4.3 (Rocko) is planned for after 2.3.4 =B7 YP 2.2.4 (Morty) is planned for after 2.4.3 Tracking Metrics: =B7 WDD 2510 (last week 2515) (https://wiki.yoctoproject.org/charts= /combo.html) =B7 Patches o Total patches found: 1599 (last week 1591) o Percentage of patches in the Pending State: 47% (last week 47%) Key Status Links for YP: https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.6_Status https://wiki.yoctoproject.org/wiki/Yocto_2.6_Schedule https://wiki.yoctoproject.org/wiki/Yocto_2.6_Features The Status reports are now stored on the wiki at: https://wiki.yoctoproject= .org/wiki/Weekly_Status [If anyone has suggestions for other information you=92d like to see on thi= s weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Project Manager INTEL, MS JF1-255, 2111 N.E. 25th Avenue, Hillsboro, OR 97124 =95 Cell: (208) 244-4460 =95 Email: stephen.k.jolley@intel.com --_000_9ADD3FDE8B189B4AA2F8A3C711F8155EC730CA94fmsmsx111amrcor_ Content-Type: text/html; charset="Windows-1252" Content-Transfer-Encoding: quoted-printable

Current Dev Positi= on: YP 2.6 M1 is accepting patches.

Next Deadline: YP = 2.6 M1 release is June 11, 2018

 

SWAT Team Rotation= :

=B7         SWAT lead is currently: Ross=

=B7         SWAT team rotation: Ross -> Pa= ul on May 25, 2018

=B7         SWAT team rotation: Paul -> Tr= acy on June 1, 2018

=B7         https://wiki.yoctopro= ject.org/wiki/Yocto_Build_Failure_Swat_Team

 

Key Status/Updates= :

=B7         We thought 2.4.3 had built and go= ne into QA however it seems something wasn=92t configured correctly and thi= s didn=92t happen. We=92ll requeue it again today.

=B7         There was a second 2.6 planning t= echnical call on 15th where some further topics for 2.6 were discussed and = some people/companies showed interest in those areas.

=B7         The next discussion on 2.6 planni= ng will happen on June 5, 2018 at 8am PDT.

=B7         There were blocking issues with t= he new buildbot/autobuilder codebase which were preventing feature parity b= etween the old and new codebases but after discussion with upstream we now have a plan on how to move forward. This unblocks pro= gress on the new infrastructure.

 

Planned Releases f= or YP 2.6:

=B7         YP 2.6 M1 Build Target is June 11= , 2018

=B7         YP 2.6 M1 Release Target is June = 22, 2018

=B7         YP 2.6 M2 Build Target is July 16= , 2018

=B7         YP 2.6 M2 Release Target is July = 27, 2018

=B7         YP 2.6 M3 Build Target is Aug. 27= , 2018

=B7         YP 2.6 M3 Release Target is Sept.= 7, 2018

=B7         YP 2.6 M4 Build Target is Oct. 1,= 2018

=B7         YP 2.6 M4 Release Target is Oct. = 26, 2018

 

Planned upcoming d= ot releases:

=B7         YP 2.3.4 (Pyro) will be built thi= s week

=B7         YP 2.4.3 (Rocko) is planned for a= fter 2.3.4

=B7         YP 2.2.4 (Morty) is planned for a= fter 2.4.3

 

Tracking Metrics:<= /span>

=B7         WDD 2510 (last week 2515)<= span style=3D"font-size:11.0pt;font-family:Consolas;color:black"> (<= span style=3D"font-size:11.0pt;font-family:"Arial",sans-serif;col= or:black">https://wiki.yoctoproject.org/charts/combo.html)

=B7         Patches  

o    Total patches found: 1599 (last w= eek 1591)

o    Percentage of patches in the Pend= ing State: 47% (last week 47%)

 

Key Status Links f= or YP:

https://wiki.yoctoproject.org/wiki/Yoc= to_Project_v2.6_Status

https://wiki.yoctoproject.org/wiki/Yocto_2.6_= Schedule

https://wiki.yoctoproject.org/wiki/Yocto_2.6_= Features

 

The Status reports= are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status

 

[If anyone has sug= gestions for other information you=92d like to see on this weekly status up= date, let us know!]

 

Thanks,

 

Stephen K. Jolley

Yocto Project Project Manager

INTEL, MS JF1-255, 2111 N.E. 25th Avenue, Hillsboro, OR 97124

(    Cell:      &= nbsp;        

* Email:&nb= sp;            =             &nb= sp;   stephen.k.jolley@intel.com<= span lang=3D"FR" style=3D"font-size:12.0pt;font-family:"Arial",sa= ns-serif">

 

--_000_9ADD3FDE8B189B4AA2F8A3C711F8155EC730CA94fmsmsx111amrcor_--