From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Received: by yocto-www.yoctoproject.org (Postfix, from userid 118) id B89B5E0053F; Tue, 28 Aug 2018 07:55:24 -0700 (PDT) X-Spam-Checker-Version: SpamAssassin 3.3.1 (2010-03-16) on yocto-www.yoctoproject.org X-Spam-Level: X-Spam-Status: No, score=-4.2 required=5.0 tests=BAYES_00,HTML_MESSAGE, RCVD_IN_DNSWL_MED,SPF_HELO_PASS autolearn=ham version=3.3.1 X-Spam-HAM-Report: * -2.3 RCVD_IN_DNSWL_MED RBL: Sender listed at http://www.dnswl.org/, * medium trust * [192.55.52.136 listed in list.dnswl.org] * -0.0 SPF_HELO_PASS SPF: HELO matches SPF record * -1.9 BAYES_00 BODY: Bayes spam probability is 0 to 1% * [score: 0.0000] * 0.0 HTML_MESSAGE BODY: HTML included in message Received: from mga12.intel.com (mga12.intel.com [192.55.52.136]) by yocto-www.yoctoproject.org (Postfix) with ESMTP id 8C4B3E0043F for ; Tue, 28 Aug 2018 07:55:23 -0700 (PDT) X-Amp-Result: SKIPPED(no attachment in message) X-Amp-File-Uploaded: False Received: from orsmga002.jf.intel.com ([10.7.209.21]) by fmsmga106.fm.intel.com with ESMTP/TLS/DHE-RSA-AES256-GCM-SHA384; 28 Aug 2018 07:55:23 -0700 X-ExtLoop1: 1 X-IronPort-AV: E=Sophos;i="5.53,299,1531810800"; d="scan'208,217";a="87037372" Received: from fmsmsx108.amr.corp.intel.com ([10.18.124.206]) by orsmga002.jf.intel.com with ESMTP; 28 Aug 2018 07:55:22 -0700 Received: from fmsmsx117.amr.corp.intel.com (10.18.116.17) by FMSMSX108.amr.corp.intel.com (10.18.124.206) with Microsoft SMTP Server (TLS) id 14.3.319.2; Tue, 28 Aug 2018 07:55:22 -0700 Received: from fmsmsx112.amr.corp.intel.com ([169.254.5.84]) by fmsmsx117.amr.corp.intel.com ([169.254.3.210]) with mapi id 14.03.0319.002; Tue, 28 Aug 2018 07:55:21 -0700 From: "Jolley, Stephen K" To: "yocto@yoctoproject.org" , "openembedded-core@lists.openembedded.org" Thread-Topic: =?Windows-1252?Q?Yocto_Project_Status_WW35=9218?= Thread-Index: AdQ+2uUMQVLGpTt/Stmp6ZVTHdq6NA== Date: Tue, 28 Aug 2018 14:55:20 +0000 Message-ID: <9ADD3FDE8B189B4AA2F8A3C711F8155ECE46ABEA@FMSMSX112.amr.corp.intel.com> Accept-Language: en-US X-MS-Has-Attach: X-Auto-Response-Suppress: DR, OOF, AutoReply X-MS-TNEF-Correlator: x-originating-ip: [10.1.200.106] x-ctpclassification: CTP_NT x-titus-metadata-40: eyJDYXRlZ29yeUxhYmVscyI6IiIsIk1ldGFkYXRhIjp7Im5zIjoiaHR0cDpcL1wvd3d3LnRpdHVzLmNvbVwvbnNcL0ludGVsMyIsImlkIjoiYTQyZGU3NGQtNzllZS00YzJlLWE1YzctZTE4YzNjMWI0NjVhIiwicHJvcHMiOlt7Im4iOiJDVFBDbGFzc2lmaWNhdGlvbiIsInZhbHMiOlt7InZhbHVlIjoiQ1RQX05UIn1dfV19LCJTdWJqZWN0TGFiZWxzIjpbXSwiVE1DVmVyc2lvbiI6IjE3LjEwLjE4MDQuNDkiLCJUcnVzdGVkTGFiZWxIYXNoIjoiTHNTdTM3R1l5dFBCbFBCd1R2dlBGOG51MXlcL3dRTDNXTkR0MU40SjNzOU9PZ3gxRzc0b3dqc2s2cDA0RVB3UDAifQ== dlp-product: dlpe-windows dlp-version: 11.0.400.15 dlp-reaction: no-action MIME-Version: 1.0 Subject: =?UTF-8?B?WW9jdG8gUHJvamVjdCBTdGF0dXMgV1czNeKAmTE4?= X-BeenThere: yocto@yoctoproject.org X-Mailman-Version: 2.1.13 Precedence: list List-Id: Discussion of all things Yocto Project List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Tue, 28 Aug 2018 14:55:24 -0000 Content-Language: en-US Content-Type: multipart/alternative; boundary="_000_9ADD3FDE8B189B4AA2F8A3C711F8155ECE46ABEAFMSMSX112amrcor_" --_000_9ADD3FDE8B189B4AA2F8A3C711F8155ECE46ABEAFMSMSX112amrcor_ Content-Type: text/plain; charset="Windows-1252" Content-Transfer-Encoding: quoted-printable Current Dev Position: YP 2.6 M3. - This is feature freeze for YP 2.6! Next Deadline: YP 2.6 M3 Build Target is Aug. 27, 2018 SWAT Team Rotation: =B7 SWAT lead is currently: Paul =B7 SWAT team rotation: Paul -> Ross on Aug. 31, 2018 =B7 SWAT team rotation: Ross -> Amanda on Sept. 7, 2018 =B7 https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Tea= m Key Status/Updates: =B7 We=92re now into M3 feature freeze so new feature patches, part= icularly for unplanned changes will be much less likely to be merged until = 2.7 now. =B7 Fixes merged for hardlinked files and their debug symbol links = including new test cases to ensure this does not regress =B7 Pending kernel upgrades (to 4.18) and other kernel changes for = 2.6 merged =B7 There was a change to the cpan class code which broke various e= xternal perl recipes. A secondary fix has been merged but needs testing, if= it fails we may need to revert the original change. =B7 Some key changes in toaster merged =B7 Some oeqa race/logging output issues were identified and fixed =B7 The sstate equivalency server work from Joshua/Garmin has revie= w still pending and identifying/fixing persist_data fork issues (it's partl= y tracked down but not completely). =B7 2.4 (rocko) series stabilization continues for the next point r= elease 2.4.4 =B7 Autobuilder2 now includes instructions on setting up and rebuil= ding the Yocto Console UI plugin =B7 We have a build speed performance regression where the llvm bui= ld time and python pgo optimisation time added by new recent features mean = builds are now taking around 45 minutes longer on our standard benchmarking= system (1:26 -> 2:11). =B7 This llvm dependency addition to mesa by default means image si= ze for core-image-sato also increased substantially (230MB -> 309MB). Planned Releases for YP 2.6: =B7 YP 2.6 M3 Build Target is Aug. 27, 2018 =B7 YP 2.6 M3 Release Target is Sept. 7, 2018 =B7 YP 2.6 M4 Build Target is Oct. 1, 2018 =B7 YP 2.6 M4 Release Target is Oct. 26, 2018 Planned upcoming dot releases: =B7 YP 2.4.4 (Rocko) will be targeted after YP 2.6 M4 is done. =B7 YP 2.5.2 (Sumo) will be targeted after YP 2.4.4 is done. Tracking Metrics: =B7 WDD 2610 (last week 2578) (https://wiki.yoctoproject.org/charts= /combo.html) =B7 Poky Patch Metrics o Total patches found: 1636 (last week 1623) o Percentage of patches in the Pending State: 737 (45%) [last week 737 (= 45%)] Key Status Links for YP: https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.6_Status https://wiki.yoctoproject.org/wiki/Yocto_2.6_Schedule https://wiki.yoctoproject.org/wiki/Yocto_2.6_Features The Status reports are now stored on the wiki at: https://wiki.yoctoproject= .org/wiki/Weekly_Status [If anyone has suggestions for other information you=92d like to see on thi= s weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Program Manager INTEL, MS JF1-255, 2111 N.E. 25th Avenue, Hillsboro, OR 97124 =95 Cell: (208) 244-4460 =95 Email: stephen.k.jolley@intel.com --_000_9ADD3FDE8B189B4AA2F8A3C711F8155ECE46ABEAFMSMSX112amrcor_ Content-Type: text/html; charset="Windows-1252" Content-Transfer-Encoding: quoted-printable

Current Dev Positi= on: YP 2.6 M3. - This is feature freeze for YP 2.6!

Next Deadline: YP = 2.6 M3 Build Target is Aug. 27, 2018

 

SWAT Team Rotation= :

=B7         SWAT lead is currently: Paul=

=B7         SWAT team rotation: Paul -> Ro= ss on Aug. 31, 2018

=B7         SWAT team rotation: Ross -> Am= anda on Sept. 7, 2018

=B7         https://wiki.yoctopro= ject.org/wiki/Yocto_Build_Failure_Swat_Team

 

Key Status/Updates= :

=B7         We=92re now into M3 feature freez= e so new feature patches, particularly for unplanned changes will be much l= ess likely to be merged until 2.7 now.

=B7         Fixes merged for hardlinked files= and their debug symbol links including new test cases to ensure this does = not regress

=B7         Pending kernel upgrades (to 4.18)= and other kernel changes for 2.6 merged

=B7         There was a change to the cpan cl= ass code which broke various external perl recipes. A secondary fix has bee= n merged but needs testing, if it fails we may need to revert the original change.

=B7         Some key changes in toaster merge= d

=B7         Some oeqa race/logging output iss= ues were identified and fixed

=B7         The sstate equivalency server wor= k from Joshua/Garmin has review still pending and identifying/fixing persis= t_data fork issues (it's partly tracked down but not completely).

=B7         2.4 (rocko) series stabilization = continues for the next point release 2.4.4

=B7         Autobuilder2 now includes instruc= tions on setting up and rebuilding the Yocto Console UI plugin

=B7         We have a build speed performance= regression where the llvm build time and python pgo optimisation time adde= d by new recent features mean builds are now taking around 45 minutes longer on our standard benchmarking system (1:26 = -> 2:11).

=B7         This llvm dependency addition to = mesa by default means image size for core-image-sato also increased substan= tially (230MB -> 309MB).

 

Planned Releases f= or YP 2.6:

=B7         YP 2.6 M3 Build Target is Aug. 27= , 2018

=B7         YP 2.6 M3 Release Target is Sept.= 7, 2018

=B7         YP 2.6 M4 Build Target is Oct. 1,= 2018

=B7         YP 2.6 M4 Release Target is Oct. = 26, 2018

 

Planned upcoming d= ot releases:

=B7         YP 2.4.4 (Rocko) will be targeted= after YP 2.6 M4 is done.

=B7         YP 2.5.2 (Sumo) will be targeted = after YP 2.4.4 is done.

 

Tracking Metrics:<= /span>

=B7         WDD 2610 (last week 2578)<= span style=3D"font-size:11.0pt;font-family:Consolas;color:black"> (<= span style=3D"font-size:11.0pt;font-family:"Arial",sans-serif;col= or:black">https://wiki.yoctoproject.org/charts/combo.html)

=B7         Poky Patch Metrics  <= span style=3D"font-size:11.0pt;font-family:Consolas;color:black">

o    Total patches found: 1636 (last w= eek 1623)

o    Percentage of patches in the Pend= ing State: 737 (45%) [last week 737 (45%)]

 

Key Status Links f= or YP:

https://wiki.yoctoproject.org/wiki/Yoc= to_Project_v2.6_Status

https://wiki.yoctoproject.org/wiki/Yocto_2.6_= Schedule

https://wiki.yoctoproject.org/wiki/Yocto_2.6_= Features

 

The Status reports= are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status

 

[If anyone has sug= gestions for other information you=92d like to see on this weekly status up= date, let us know!]

 

Thanks,

 

Stephen K. Jolley

Yocto Project Program Manager

INTEL, MS JF1-255, 2111 N.E. 25th Avenue, Hillsboro, OR 97124

(    Cell:     &= nbsp;          (208) 244-4460=

* Email:           &n= bsp;            = ;     stephen.k.jolley@intel.com<= span lang=3D"FR" style=3D"font-size:12.0pt;font-family:"Arial",sa= ns-serif">

 

--_000_9ADD3FDE8B189B4AA2F8A3C711F8155ECE46ABEAFMSMSX112amrcor_--