On 20 March 2018 at 10:07, Alexander Kanavin <alexander.kanavin@linux.intel.com> wrote:
On 03/19/2018 10:07 PM, Burton, Ross wrote:
    Do we have a place identified for new changes (2.6) while 2.5
    stabilizes.


A formal place, no.  I tend to queue stuff in a branch if master isn't taking all of my energy, otherwise the patches will sit on the list until 2.5 releases.  Typically master and sumo branches won't diverge until post-release.

Which brings me to a question: what is a good schedule and cadence for AUH runs? Currently it's run on the 15th of every odd-numbered month (so January, March, and so on), but I thought of shifting it one month forward, so it doesn't land right in the middle of a feature freeze. Thoughts?

How long does a single run take, and why not run it every month?

Ross