Current Dev Position: YP 3.1 M3 - At Feature Freeze, build pending

Next Deadline: YP 3.1 M3 build date 2/24/2020

 

Next Team Meetings:

*	Bug Triage meeting Thursday Mar. 12th  at 7:30am PDT (
<https://zoom.us/j/454367603> https://zoom.us/j/454367603)
*	Monthly Project Meeting Tuesday Apr. 7th  at 8am PDT (
<https://zoom.us/j/990892712> https://zoom.us/j/990892712)
*	Weekly Engineering Sync Tuesday Mar. 10th  at 8am PDT (
<https://zoom.us/j/990892712> https://zoom.us/j/990892712)
*	Twitch -  See http://www.twitch.tv/letoatreidesthe2nd

 

Key Status/Updates:

*	YP 3.1 has been announced as an LTS release:
<https://www.yoctoproject.org/yocto-project-long-term-support-announced/>
https://www.yoctoproject.org/yocto-project-long-term-support-announced/
*	We are now past M3 feature freeze. The blocking issues continue to
reduce, thanks to everyone who has contributed fixes. The remaining issues
are:

*	continued minor bugs with buildtools tarball integration
*	coreutils ptest blocked on reproducibility issues with gcc-plugins
*	SystemExit() intermittent selftest failure
*	pseudo sysroot high priority bug

*	There are significant changes proposed to bitbake's logging
structure to address concerns raised by hashequiv changes. These are
currently in testing and are likely to become part of M3 given the timing,
wider review is welcome.
*	Recipe upgrades are now unlikely to be merged into 3.1 as we focus
on stabilizing and bug fixing for the release
*	Autobuilder build results continue to be a concern as we're not
getting green builds very often due to multiple varied issues.

 

YP 3.1 Milestone Dates:

*	YP 3.1 M3 build date 2/24/2020
*	YP 3.1 M3 release date 3/6/2020
*	YP 3.1 M4 build date  3/30/2020
*	YP 3.1 M4 release date  4/24/2020

 

Planned upcoming dot releases:

*	YP 3.0.3 build date  5/4/2020
*	YP 3.0.3 release date 5/15/2020
*	YP 2.7.4 build date  5/18/2020
*	YP 2.7.4 release date 5/29/2020

 

Tracking Metrics:

*	WDD 2703 (last week 2720) (
<https://wiki.yoctoproject.org/charts/combo.html>
https://wiki.yoctoproject.org/charts/combo.html)
*	Poky Patch Metrics  

*	Total patches found: 1354 (last week 1346)
*	Patches in the Pending State: 541 (40%) [last week 539 (40%)]

 

The Yocto Project's technical governance is through its Technical Steering
Committee, more information is available at:

 <https://wiki.yoctoproject.org/wiki/TSC>
https://wiki.yoctoproject.org/wiki/TSC

 

The Status reports are now stored on the wiki at:
<https://wiki.yoctoproject.org/wiki/Weekly_Status>
https://wiki.yoctoproject.org/wiki/Weekly_Status

 

[If anyone has suggestions for other information you'd like to see on this
weekly status update, let us know!]

 

Thanks,

 

Stephen K. Jolley

Yocto Project Program Manager

*    Cell:                (208) 244-4460

* Email:              sjolley.yp.pm@gmail.com
<mailto:sjolley.yp.pm@gmail.com> 

 


[-- Attachment #2: Type: text/html, Size: 33028 bytes --]

^ permalink raw reply	[flat|nested] 2+ messages in thread

* Yocto Project Status WW10'20
@ 2020-03-10 14:45 ` sjolley.yp.pm
  0 siblings, 0 replies; 2+ messages in thread
From: sjolley.yp.pm @ 2020-03-10 14:45 UTC (permalink / raw)
  To: yocto, openembedded-core

[-- Attachment #1: Type: text/plain, Size: 2990 bytes --]

Current Dev Position: YP 3.1 M3 - At Feature Freeze, build pending

Next Deadline: YP 3.1 M3 build date 2/24/2020

 

Next Team Meetings:

*	Bug Triage meeting Thursday Mar. 12th  at 7:30am PDT (
<https://zoom.us/j/454367603> https://zoom.us/j/454367603)
*	Monthly Project Meeting Tuesday Apr. 7th  at 8am PDT (
<https://zoom.us/j/990892712> https://zoom.us/j/990892712)
*	Weekly Engineering Sync Tuesday Mar. 10th  at 8am PDT (
<https://zoom.us/j/990892712> https://zoom.us/j/990892712)
*	Twitch -  See http://www.twitch.tv/letoatreidesthe2nd

 

Key Status/Updates:

*	YP 3.1 has been announced as an LTS release:
<https://www.yoctoproject.org/yocto-project-long-term-support-announced/>
https://www.yoctoproject.org/yocto-project-long-term-support-announced/
*	We are now past M3 feature freeze. The blocking issues continue to
reduce, thanks to everyone who has contributed fixes. The remaining issues
are:

*	continued minor bugs with buildtools tarball integration
*	coreutils ptest blocked on reproducibility issues with gcc-plugins
*	SystemExit() intermittent selftest failure
*	pseudo sysroot high priority bug

*	There are significant changes proposed to bitbake's logging
structure to address concerns raised by hashequiv changes. These are
currently in testing and are likely to become part of M3 given the timing,
wider review is welcome.
*	Recipe upgrades are now unlikely to be merged into 3.1 as we focus
on stabilizing and bug fixing for the release
*	Autobuilder build results continue to be a concern as we're not
getting green builds very often due to multiple varied issues.

 

YP 3.1 Milestone Dates:

*	YP 3.1 M3 build date 2/24/2020
*	YP 3.1 M3 release date 3/6/2020
*	YP 3.1 M4 build date  3/30/2020
*	YP 3.1 M4 release date  4/24/2020

 

Planned upcoming dot releases:

*	YP 3.0.3 build date  5/4/2020
*	YP 3.0.3 release date 5/15/2020
*	YP 2.7.4 build date  5/18/2020
*	YP 2.7.4 release date 5/29/2020

 

Tracking Metrics:

*	WDD 2703 (last week 2720) (
<https://wiki.yoctoproject.org/charts/combo.html>
https://wiki.yoctoproject.org/charts/combo.html)
*	Poky Patch Metrics  

*	Total patches found: 1354 (last week 1346)
*	Patches in the Pending State: 541 (40%) [last week 539 (40%)]

 

The Yocto Project's technical governance is through its Technical Steering
Committee, more information is available at:

 <https://wiki.yoctoproject.org/wiki/TSC>
https://wiki.yoctoproject.org/wiki/TSC

 

The Status reports are now stored on the wiki at:
<https://wiki.yoctoproject.org/wiki/Weekly_Status>
https://wiki.yoctoproject.org/wiki/Weekly_Status

 

[If anyone has suggestions for other information you'd like to see on this
weekly status update, let us know!]

 

Thanks,

 

Stephen K. Jolley

Yocto Project Program Manager

*    Cell:                (208) 244-4460

* Email:              sjolley.yp.pm@gmail.com
<mailto:sjolley.yp.pm@gmail.com> 

 


[-- Attachment #2: Type: text/html, Size: 33028 bytes --]

^ permalink raw reply	[flat|nested] 2+ messages in thread

end of thread, other threads:[~2020-03-10 14:45 UTC | newest]

Thread overview: 2+ messages (download: mbox.gz / follow: Atom feed)
-- links below jump to the message on this page --
2020-03-10 14:45 Yocto Project Status WW10'20 Stephen Jolley
2020-03-10 14:45 ` sjolley.yp.pm

This is an external index of several public inboxes,
see mirroring instructions on how to clone and mirror
all data and code used by this external index.