All of lore.kernel.org
 help / color / mirror / Atom feed
* Yocto Project Status WW26
@ 2016-06-24 15:14 Jolley, Stephen K
  0 siblings, 0 replies; 2+ messages in thread
From: Jolley, Stephen K @ 2016-06-24 15:14 UTC (permalink / raw)
  To: yocto, openembedded-core

[-- Attachment #1: Type: text/plain, Size: 1829 bytes --]

Current Dev Position: YP 2.2 M2

Next Deadline: YP 2.2 M2 cut off would be: 7/18/16


SWAT team rotation: Joshua -> Armin

https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


Key Status/Updates:

*        After delays in addressing several issues, a build of 2.2 M1 went into QA and is undergoing testing. Whilst M1 was late, many good bug fixes were merged so it was worth the delay.

*        Testing so far seems positive except for reports of some wic issues.

*        Some merging of patches for M2 is now underway.

*        The multi-config builds patchset is maturing and now basically works, it needs splitting up and submitting. The major missing piece of functionality is inter-multi-config dependency support.


Key YP 2.2 Dates:

*        YP 2.2 M1 release would be: 6/24/16

*        YP 2.2 M2 cut off would be: 7/18/16

*        YP 2.2 M2 release would be: 7/29/16

*        YP 2.2 M3 cut off would be: 8/29/16

*        YP 2.2 M3 release would be: 9/9/16

*        YP 2.2 M4 cut off would be: 10/3/16

*        YP 2.2 M4 release would be: 10/28/16


Tracking Metrics:

            WDD 2745 (last week 2678)

(https://wiki.yoctoproject.org/charts/combo.html)


Key Status Links for YP:

https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.2_Status

https://wiki.yoctoproject.org/wiki/Yocto_2.2_Schedule

https://wiki.yoctoproject.org/wiki/Yocto_2.2_Features

[If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!]

Thanks,

Stephen K. Jolley
Yocto Project Program Manager
INTEL, MS JF1-255, 2111 N.E. 25th Avenue, Hillsboro, OR 97124
*   Work Telephone:        (503) 712-0534
*    Cell:               (208) 244-4460
* Email:                            stephen.k.jolley@intel.com

[-- Attachment #2: Type: text/html, Size: 26557 bytes --]

^ permalink raw reply	[flat|nested] 2+ messages in thread

* Yocto Project Status WW26
@ 2015-06-26 15:28 Jolley, Stephen K
  0 siblings, 0 replies; 2+ messages in thread
From: Jolley, Stephen K @ 2015-06-26 15:28 UTC (permalink / raw)
  To: yocto, openembedded-core

[-- Attachment #1: Type: text/plain, Size: 1556 bytes --]

Current Dev Position: 1.9 Milestone 2 (M2)
Next Deadline: M2 cut off of July 27th at noon GMT

SWAT team rotation: Beth -> Saul
https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team

Key Status/Updates:
YP 1.9 M1 is in QA - Target for release is before July 10th.
https://wiki.yoctoproject.org/wiki/1.9_QA_Status (automatically fills as QA completes)
Various oe-selftest issues were fixed for various distros
UUID support for initramfs/live installer/wic
Fido builds being worked on for gcc 5.x issues

Key YP 1.9 Dates:
1.9 Feature Freeze Date/M3 Cut off: Aug. 24, 2015 noon GMT
YP Final/M4 Cut off: Sept. 28, 2015 noon GMT
1.9 M1 Release Target: Before July 10, 2015
1.9 M2 Release Target: Before Aug. 14, 2015
1.9 M3 Release Target: Before Sept. 11 2015
1.9 final Release Target: Before Oct. 30, 2015

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v1.9_Status
https://wiki.yoctoproject.org/wiki/Yocto_1.9_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_1.9_Features

Tracking Metrics:
            WDD 1724 (last week 1749)
(https://wiki.yoctoproject.org/charts/combo.html)

[If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!]

Thanks,

Stephen K. Jolley
Yocto Project Program Manager
INTEL, MS JF1-255, 2111 N.E. 25th Avenue, Hillsboro, OR 97124
*   Work Telephone:          (503) 712-0534
*    Cell:                                (208) 244-4460
* Email:                             stephen.k.jolley@intel.com


[-- Attachment #2: Type: text/html, Size: 16565 bytes --]

^ permalink raw reply	[flat|nested] 2+ messages in thread

end of thread, other threads:[~2016-06-24 15:14 UTC | newest]

Thread overview: 2+ messages (download: mbox.gz / follow: Atom feed)
-- links below jump to the message on this page --
2016-06-24 15:14 Yocto Project Status WW26 Jolley, Stephen K
  -- strict thread matches above, loose matches on Subject: below --
2015-06-26 15:28 Jolley, Stephen K

This is an external index of several public inboxes,
see mirroring instructions on how to clone and mirror
all data and code used by this external index.